廣州觀達(dá)路數(shù)據(jù)中心
Guangzhou Guanda Data Center
華南云計(jì)算數(shù)據(jù)中心集群一期
1st phase of South China Cloud Computing Data Center Cluster
廣州觀達(dá)路數(shù)據(jù)中心位于廣州市黃埔區(qū)觀達(dá)路20號(hào),距廣深高速蘿崗出口約2公里,是本公司華南云計(jì)算數(shù)據(jù)中心集群的一期項(xiàng)目。觀達(dá)路數(shù)據(jù)中心為4層建筑,總面積約2.4萬(wàn)平方米,約2,800個(gè)機(jī)柜,2018年投產(chǎn)。
Guangzhou Guanda Data Center, the 1st phase project of South China Cloud Computing Data Center Cluster, is located in No. 20 Guanda Road, Huangpu District, Guanghzou, 2km from Luogang Exit of Guangzhou-Shenzhen Highway. With 4 storeys and 24,000㎡ construction area, Guanda Road Data Center will provide 2,800 cabinets in total, and put into operation in 2018.
建設(shè)參數(shù)
Construction Parameters
廣東省廣州市黃埔區(qū)科學(xué)城觀達(dá)路20號(hào)
No. 20 Guanda Road, Guangzhou Science City, Huangpu District, Guangzhou, Guangdong
|
獨(dú)棟,鋼筋混凝土框架結(jié)構(gòu)體系
Detached building, ferroconcrete frame structure
層高一層6.8m,二、三層3.83m,四層4.82m
Story heights: 1st floor: 6.8m, 2nd-3rd floor: 3.83m, 4th floor: 4.82m
地板承重10-15KN/㎡
Loading capacity: 10-15KN/㎡
專用貨運(yùn)電梯及貨物卸載區(qū),貨梯載重2噸
Freight elevator (2 tons), loading bay
|
雙路供電,供電容量37500KVA
Dual paths, power supply capability: 37,500KVA
UPS系統(tǒng)2N冗余配置,滿載后備電力15分鐘
UPS system with 2N redundant configuration; UPS battery backup time at rated load: 15minutes
柴發(fā)采用N+1配置,滿載后備供電12小時(shí),與附近供油部門(mén)簽署協(xié)議
Diesel generator with N+1 redundant configuration, operating 12 hours without refueling, and have been signed agreement with the suppliers nearby.
單機(jī)柜電力13A~20A,局部可按需改造
Each rack power: 13A~20A; partial rack power could be expanded
|
-
制冷系統(tǒng) Air Conditioning
機(jī)房使用精密空調(diào)調(diào)節(jié)室內(nèi)溫度和濕度
Precision air-conditioners control IDC temperature and humidity
空調(diào)系統(tǒng)采用UPS電源供電,空調(diào)冗余N+1
N+1 redundant air-conditioning system powered by UPS
地板下送風(fēng),上回風(fēng),冷通道封閉(冷熱通道嚴(yán)格隔離)
Down-flow air supply, up-flow air return, enclosed cold passages (cold and hot passages are isolated)
水冷,給水中斷的情況下系統(tǒng)24小時(shí)的正常運(yùn)行;蓄冷罐15分鐘不間斷制冷
Water cooling system operates 24 hours without water supply; cold storage tank provides 15 minutes’ cooling in case chillers fail
|
采用IG541自動(dòng)氣體滅火系統(tǒng)
IG541 automatic gas fire-fighting system
分區(qū)相互獨(dú)立,可以實(shí)現(xiàn)分區(qū)滅火,此外配備手持式滅火器及空氣呼吸器
Independent zone for fire-fighting separately, each zone equipped with handheld extinguisher and air-breather
與空調(diào)、新風(fēng)、門(mén)禁、計(jì)算機(jī)供電和市電等系統(tǒng)聯(lián)動(dòng)
Linked air-conditioning, air, access control, computer power supply and city power etc. system
|
可根據(jù)用戶需求定點(diǎn)增加高清攝像設(shè)備
HD cameras could be added as needed on spot
授權(quán)門(mén)禁系統(tǒng)、紅外探測(cè),支持重點(diǎn)區(qū)域設(shè)施改造
Access control system, infrared detection, renovation for key area infrastructure
人員權(quán)限設(shè)置,設(shè)備安全管理,多層安全防范與管理
Staff permission setting, devices safety management, multi-levels security protection and management
|
-
網(wǎng)絡(luò)環(huán)境 Connectivity
按需接入各大運(yùn)營(yíng)網(wǎng)絡(luò)
Backbone network link to China Mobile
多線均萬(wàn)兆對(duì)接,可隨時(shí)根據(jù)實(shí)際需求進(jìn)行擴(kuò)容
Tens of gigabit multiline, scalable as needed
提供144芯裸纖資源,可支持鏈路改造
144 core bare fiber resource, supporting link renovation
|
7×24小時(shí)值守,5 分鐘內(nèi)響應(yīng),15分鐘內(nèi)應(yīng)急處理反饋
7×24 hours guarding, quick response in 5 minutes, emergency processing and feedback in 15 minutes
擁有完備的應(yīng)急方案、完善的應(yīng)急管理流程,切實(shí)保障業(yè)務(wù)連續(xù)性
Complete emergency solutions and emergency management process to guarantee business continuity
|